A 10x10 concrete slab is the classic DIY concrete project. At 100 square feet, it is small enough to pour with bagged concrete mix (though a ready-mix delivery is still an option), and the resulting slab serves dozens of purposes: shed foundations, hot tub pads, generator bases, AC condenser pads, and small workshop floors.

At 4 inches thick (the minimum for a slab that will support only foot traffic and light storage), a 10x10 slab requires about 1.23 cubic yards of concrete. With a 10 percent waste factor, plan for 1.36 cubic yards. That translates to approximately 56 bags of 80-pound concrete mix, which two people can mix and pour in about 3 to 4 hours using a portable mixer.

The decision between DIY bagged concrete and a ready-mix truck delivery comes down to labor tolerance and budget. At roughly $5.50 per bag, 56 bags cost about $308. A minimum ready-mix delivery (usually 1 to 1.5 yards) runs $175 to $250 depending on your area, but arrives mixed and ready to pour. For a 10x10 slab, bagged concrete makes sense if you have a helper and a mixer, but a truck delivery saves 3 hours of manual labor for roughly the same total cost.

A 10x10 slab at 4 inches thick requires approximately 1.2 to 1.4 cubic yards of concrete, including 10 percent waste factor.

Concrete Slab Calculator
1.36
cubic yards (incl. 10% waste)
61 bags (80 lb). Est. ready-mix cost: $204 at $150/yard.

How it works

The volume formula for a 10x10 slab at 4 inches: 10 times 10 times (4 divided by 12) equals 33.3 cubic feet. Divide by 27 to convert to cubic yards: 1.23 yards. Add 10 percent waste: 1.36 yards. For 80-pound bags at 0.6 cubic feet each: 33.3 times 1.1 divided by 0.6 equals 61 bags.

The 4-inch thickness assumes a well-compacted gravel base (typically 4 inches of compacted gravel under the slab). If your soil is clay or frequently wet, increase to 6 inches of gravel base. The slab thickness stays at 4 inches for foot traffic only. For any vehicle access or heavy equipment, step up to 6 inches (which increases concrete volume by 50 percent).

Forms for a 10x10 slab require 40 linear feet of 2x4 or 2x6 lumber, staked every 2 feet. Set forms level and check diagonal measurements (both diagonals should equal 14 feet 2 inches for a perfect square). Uneven forms produce an uneven slab, which you cannot fix after the pour.

When to use this calculation

This preset is ideal for shed foundations (most prefab sheds up to 10x10 sit directly on a slab), outdoor storage pad projects, hot tub bases (check your tub weight requirements, as some need 6-inch slabs), AC condenser pads (though many AC units only need a 3x3 pad), and small workshop or greenhouse floors. If your project is even slightly larger than 10x10, recalculate rather than rounding. A 10x12 slab needs 18 percent more concrete than a 10x10.

Frequently asked questions

Do I need rebar in a 10x10 slab?
For a 4-inch slab supporting only foot traffic and light storage (under 500 lbs), wire mesh (6x6 W1.4/W1.4) is sufficient and easier to work with than rebar. Place the mesh on chairs or dobies so it sits in the middle third of the slab thickness. If the slab will support a hot tub (2,000+ lbs when full) or heavy equipment, upgrade to #3 rebar at 18-inch spacing in both directions.
Can I pour a 10x10 slab by myself?
Solo pours are possible but not recommended. Concrete begins setting within 60 to 90 minutes of mixing, and 56 bags is a lot to mix, pour, screed, and float before it hardens. With two people and a portable mixer, the job is manageable in 3 to 4 hours. One person mixes while the other places and screeds. A third person makes the job comfortable rather than rushed.
How long before I can put a shed on the slab?
Wait at least 48 hours before placing light loads and 7 days before placing heavy loads like a fully loaded shed or hot tub. Concrete reaches about 70 percent of its final strength at 7 days and full strength at 28 days. During the first 7 days, keep the slab moist by spraying it with water twice daily or covering it with plastic sheeting to prevent surface cracking from rapid drying.
What kind of gravel base do I need under the slab?
Use 4 inches of compacted crushed gravel (sometimes called road base, Class 5, or 3/4-minus) under the slab. This provides drainage and prevents the slab from settling unevenly. Do not use pea gravel or round river rock as a base material, as they do not compact well. Tamp the gravel in 2-inch lifts with a plate compactor or hand tamper until it is firm and level.
How much does a 10x10 concrete slab cost total?
Total cost for a DIY 10x10 slab at 4 inches: concrete ($280 to $350 for bags, or $175 to $250 for truck delivery), gravel base ($50 to $80), forms lumber ($40 to $60), wire mesh ($25 to $40), and miscellaneous (stakes, screed board, float: $30 to $50). Grand total: $425 to $580 DIY. A contractor typically charges $800 to $1,200 for the same slab.